Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 144: | Line 144: | ||
== Run Plan: April 17-22, 2015 (day/swing/owl) == | == Run Plan: April 17-22, 2015 (day/swing/owl) == | ||
− | + | During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. Friday day shift may happen (slim probability), so be prepared. | |
− | During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. Friday day shift may happen, so be prepared. | + | Monday Swing shift will recover after significant amounts of accelerator work, so a full tune up of the Hall-B beamline will be required. |
− | '''<font size=3>Short Term Schedule: | + | '''<font size=3>Short Term Schedule: Study Trigger and SVT running conditions.</font>''' |
− | We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the | + | We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then the alcove and Faraday cup screen. Before sending beam to the alcove, call the RC. |
# MCC re-tunes upstream beam into the tagger dump. See acceptable beam documentation before moving on; | # MCC re-tunes upstream beam into the tagger dump. See acceptable beam documentation before moving on; | ||
− | # When beams are acceptable, MCC restores beams to alcove; | + | # When beams are acceptable, MCC restores beams to alcove; This requires a degauss of the tagger magnet (takes a while!) |
− | ## Notify RC | + | ## Notify RC. |
## SVT must be open, collimator must be in. | ## SVT must be open, collimator must be in. | ||
− | # | + | # BPMs were "rough" calibrated. Check old settings, but remember there is likely still a current dependence on the stripline BPMs. |
− | + | # Require good spot on Chromax, <b>low counts on halo counters</b>, have MCC turn on orbit locks if current is stable and above 15 nA, and then set-up chicane. | |
− | + | ## Note: '''If you change beam current current, turn orbit locks off first''', there is a current - position dependence on the stripline BPMs 2H00 and 2H02. | |
− | # | + | # Make sure the beam is well centered in Y and goes through the center of the HPS collimator. |
− | ## Note: '''If you change current, turn orbit locks off first''' | + | # Call SVT expert. Expert will check conditions and turn on SVT. |
− | # | + | # Take data with SVT open and check the SVT timing. |
− | # Call SVT expert. Expert will turn on SVT. | + | # Take data. Subsystem commissioning studies: more trigger commissioning studies, beam trip studies once orbit locks are on. |
− | # Take data with SVT open and | + | # Check if tracking works! |
− | # Take data. Subsystem commissioning studies: more trigger commissioning studies, beam trip studies once orbit locks are on. | ||
'''<font size=3> When we're back, proceed with program </font>''' | '''<font size=3> When we're back, proceed with program </font>''' | ||
+ | |||
+ | # <font color=red>'''Document all your work in the logbook!''' Please! <font> | ||
'''<font size=3> MCC works on beam optics and matching, and tunes beam to tagger </font>''' | '''<font size=3> MCC works on beam optics and matching, and tunes beam to tagger </font>''' | ||
Line 188: | Line 189: | ||
'''<font size=3> Energize Chicane </font>''' | '''<font size=3> Energize Chicane </font>''' | ||
− | * follow standard procedures in Beamline manuals for procedures and settings. | + | * follow standard procedures in Beamline manuals for procedures and settings. Use table for 1 GeV beam! |
* beam spot on Chromax should be unmoved. If not, tune Frascati slightly. See caution below. | * beam spot on Chromax should be unmoved. If not, tune Frascati slightly. See caution below. | ||