Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 145: | Line 145: | ||
===ECAL Instructions:=== | ===ECAL Instructions:=== | ||
− | *For additional info on beam quality, HV should ideally be ON when tuning beam on the | + | *For additional info on beam quality, HV should ideally be ON when tuning beam on the Tagger Dump. |
**To be useful, this requires DAQ Prestarted and ECAL Scaler GUIs running and monitored. | **To be useful, this requires DAQ Prestarted and ECAL Scaler GUIs running and monitored. | ||
− | *HV should be OFF | + | *HV should be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. |
**After beam is visually stable on viewers and a reasonable harp scan with 2H02A, HV can be turned ON. | **After beam is visually stable on viewers and a reasonable harp scan with 2H02A, HV can be turned ON. | ||
*HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | *HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. |
Revision as of 19:07, 29 April 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Takashi Maruyama
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for April 23-30, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Every Shift:
Setting up chicane for E=1.056 GeV
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |