Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 171: | Line 171: | ||
#*# The tagger counters and downstream counters should count <<1 Hz/nA | #*# The tagger counters and downstream counters should count <<1 Hz/nA | ||
#*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [https://logbooks.jlab.org/entry/3328991] | #*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [https://logbooks.jlab.org/entry/3328991] | ||
− | #* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/ | + | #* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3337731] |
#* Contact SVT expert to do SVT Wire Scan | #* Contact SVT expert to do SVT Wire Scan | ||
#* Insert the 4um W target without turning off the beam. | #* Insert the 4um W target without turning off the beam. |
Revision as of 13:08, 2 May 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Takashi Maruyama
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 2 - 8, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Every Shift:
Setting up chicane for E=1.056 GeV
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |