Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 133: | Line 133: | ||
# Update the run spreadsheet. | # Update the run spreadsheet. | ||
<!--# Do NOT do this: <s>After end of a Non-Junk run, [https://logbooks.jlab.org/entry/3337942 Copy the Run To Tape]</s>--> | <!--# Do NOT do this: <s>After end of a Non-Junk run, [https://logbooks.jlab.org/entry/3337942 Copy the Run To Tape]</s>--> | ||
− | # See the whiteboard for everything else that should be done on a per-run basis. | + | # See the '''whiteboard''' for everything else that should be done on a per-run basis. |
===Setting up chicane for E=1.056 GeV=== | ===Setting up chicane for E=1.056 GeV=== |
Revision as of 20:30, 5 May 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Takashi Maruyama
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 2 - 8, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Every Shift:
Every Run:
Setting up chicane for E=1.056 GeV
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |