Line 116: | Line 116: | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
+ | |||
+ | <font color=red size=3> <b> Beam trips when running SVT at 0.5 mm</b> </font> </center><br> | ||
+ | |||
+ | # Check the FSD GUI to see if high rates in the HPS halo counters generated the trip. | ||
+ | # If it's not an HPS halo counter trip, inform MCC that we want beam restored as soon as they are able and restore SVT HV. | ||
+ | # If it is an HPS halo counter trip, inform MCC that we will get back to them when we are ready for beam. | ||
+ | # Retract the SVT to its 1.5 mm stations, both top and bottom. (HV back on?) | ||
+ | # Tell MCC we are ready for beam. | ||
+ | # Once beam is restored, confirm that 2H02 beam positions x and y are as desired; and confirm that halo counter rates are as expected. | ||
+ | # Once beam is stable for ~ 1 minute, restore the SVT to its nominal position. | ||
+ | # Resume data taking. | ||
+ | |||
===Every Shift:=== | ===Every Shift:=== | ||
Line 186: | Line 198: | ||
<!--####################################### LONG TERM #################################################--> | <!--####################################### LONG TERM #################################################--> | ||
<!--####################################### LONG TERM #################################################--> | <!--####################################### LONG TERM #################################################--> | ||
− | |||
= '''Long Term Schedule''' = | = '''Long Term Schedule''' = |
Revision as of 20:56, 12 May 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 2 - 8, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Beam trips when running SVT at 0.5 mm
Every Shift:
Every Run:
Setting up chicane for E=1.056 GeVNote: This requires only Beam Permit and NO beam to HPS / Faraday Cup. This CAN be done before or during tuning beam on the Tagger Dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |