Line 113: | Line 113: | ||
--> | --> | ||
− | == Run Plan | + | == Run Plan June 15 - 17, 2019 == |
− | == | + | == Close the Hall at the beginning of the swing shift on when everyone is out and MCC is ready to sweep the Hall == |
− | * If MCC is not ready to send a beam to Hall-B, keep the hall in control access for people still doing work on detectors. | + | * If after the seep MCC is not ready to send a beam to Hall-B, keep the hall in control access for people still doing work on detectors. |
== <font color=red> !! Chicane magnets can be energized only when hall is in Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. Chicane nagnets must be off if the hall is in Restricted or in controlled access. </font>== | == <font color=red> !! Chicane magnets can be energized only when hall is in Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. Chicane nagnets must be off if the hall is in Restricted or in controlled access. </font>== | ||
== Establish beam to the tagger dump == | == Establish beam to the tagger dump == |
Revision as of 07:56, 15 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan June 15 - 17, 2019Close the Hall at the beginning of the swing shift on when everyone is out and MCC is ready to sweep the Hall
!! Chicane magnets can be energized only when hall is in Beam Permit, [1]. Chicane nagnets must be off if the hall is in Restricted or in controlled access.Establish beam to the tagger dump
Bring beam to FC (for the first time this must be done with beamline expert):
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |