Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 193: | Line 193: | ||
#* If not, turn it on. Strictly follow the procedure in the beam line manual!--> | #* If not, turn it on. Strictly follow the procedure in the beam line manual!--> | ||
# ''' Before sending a beam to the Faraday cup ''' | # ''' Before sending a beam to the Faraday cup ''' | ||
− | #* | + | #* If HPS chicane must be ON, make sure that chicane GUI says "Chicane Ready" |
#* ''' Check that SVT protection collimator is ON ''' | #* ''' Check that SVT protection collimator is ON ''' | ||
#* HPS target is '''OUT''' and ECAL HV is '''OFF''' | #* HPS target is '''OUT''' and ECAL HV is '''OFF''' | ||
Line 204: | Line 204: | ||
#* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to put corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer. | #* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to put corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer. | ||
#* If MCC operator is not able to tune the beam more than 30 minutes, then please notify RC | #* If MCC operator is not able to tune the beam more than 30 minutes, then please notify RC | ||
− | + | #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. | |
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | ||
#* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. </font></b>. | #* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. </font></b>. | ||
− | #* Tune beam profile at HPS using measured widths on 2H02A | + | #* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.05 mm, Y-width <~ 0.05 mm. |
#* Check and log the beam spot on chromax viewer | #* Check and log the beam spot on chromax viewer | ||
#* The halo counter rates before HPS must be low: | #* The halo counter rates before HPS must be low: | ||
Line 214: | Line 214: | ||
#*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [https://logbooks.jlab.org/entry/3328991] | #*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [https://logbooks.jlab.org/entry/3328991] | ||
#* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3376894] | #* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3376894] | ||
− | #* Once all the above is achieved, turn ECAL HV '''ON''' to monitor and log ECal rates | + | #* Once all the above is achieved, turn ECAL and Hodoscope HV '''ON''' to monitor and log ECal rates |
#* Insert the 4um W target without turning off the beam. | #* Insert the 4um W target without turning off the beam. | ||
# '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | # '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' |
Revision as of 12:48, 16 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and the beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert immediately and follow his/her instruction.
Run Plan June 15 - 17, 2019
Important Notes:
|
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |