Difference between revisions of "The HPS Run Wiki"
Line 135: | Line 135: | ||
* Turn ON calorimeter and the hodoscope, run DAQ (even if no SVT, only ECal and hodoscope) with 8 um W target and 100 nA. Record trigger rates (dump the trigger GUI into the logbook). With any problems with DAQ call the expert cell phone | * Turn ON calorimeter and the hodoscope, run DAQ (even if no SVT, only ECal and hodoscope) with 8 um W target and 100 nA. Record trigger rates (dump the trigger GUI into the logbook). With any problems with DAQ call the expert cell phone | ||
* Set up DAQ and perform trigger studies, bullets 1 to 3 of [https://wiki.jlab.org/hps-run/images/b/be/2021_09_03_HPS_trigger_commissioning_plan.pdf] without SVT(contact Valery on the PDL phone if needed) --> | * Set up DAQ and perform trigger studies, bullets 1 to 3 of [https://wiki.jlab.org/hps-run/images/b/be/2021_09_03_HPS_trigger_commissioning_plan.pdf] without SVT(contact Valery on the PDL phone if needed) --> | ||
− | * SVT commissioning (Cameron) | + | * Continue with SVT commissioning (Cameron) |
− | * | + | ** Setup nominal trigger and take data with 8 um W target at 70 nA, check occupancies in SVT using DQM, move SVT to 1.5 mm and take more data |
− | + | ** If conditions are right, occupancies are low move to 1 mm | |
− | * Setup nominal trigger and take data with 8 um W target at 70 nA, check occupancies in SVT using DQM, move SVT to 1.5 mm and take more data | ||
* If SVT is not ready, take FEE runs with ECal, 8 um target 150 nA. Each run 4 hours long, PROD77-NOSVT | * If SVT is not ready, take FEE runs with ECal, 8 um target 150 nA. Each run 4 hours long, PROD77-NOSVT | ||
+ | * When MCC is ready, perform beam tune to get read of beam tails, call Stepan on RC phone | ||
+ | ==Hall Access:== | ||
+ | * Investigate noise in ECal top - Nathan/Ben (4 hours) | ||
+ | * Replace/relocate the camera on the SVT chiller - Nathan (30 min) | ||
+ | * Investigate halo counter readout for HPS_R (pie tower) and HPS_SC (space frame) - Stepan (1 hour) | ||
+ | * Add one more channel of halo counters to beam modulation scheme - Stepan/Nathan (1 hour) | ||
+ | |||
<!--* Calibration runs before run ends: - DONE! | <!--* Calibration runs before run ends: - DONE! | ||
*# <del>Random trigger run, 20 um W target, 120 nA beam current, trigger file "hps_v11_5_random_15kHz.trg" - 1x4 hour run </del> | *# <del>Random trigger run, 20 um W target, 120 nA beam current, trigger file "hps_v11_5_random_15kHz.trg" - 1x4 hour run </del> |
Revision as of 09:45, 7 September 2021
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2021 2019,2016, 20152019 HPS production triggers descriptionsCOO, ESAD, RSAD Things to read before shift.Expert shift - refresher video demoRemote worker shift - requirements and responsibilitiesHPS 2021 Run discription and beam parameter requirements |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2021 run, August - October'
Beam energy 3.74 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 3 pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important instructions
* Turn OFF beam before target move!
* No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
* For orbit lock positions on 2H00(X=0.3,Y=-1.) and on 2H02(X=-2.4,Y=-1.). Use the 2.82 mm SVT collimator
Run Plan September 6 - 7, 2021
Hall Access:
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 3 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://jlab.bluejeans.com/759437905
Meeting ID: 759437905
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 329-4844 (cell) |
ECAL/Hodo | (757) 310-7198 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |
Overview
Tasks
|
Shift Worker Backup TableTo add your name, edit this wiki page or send email to Maurik or Nathan.
|