* Restore physics quality beam for the production running, start from the tagger dump (see instructions on the right)
 
* Restore physics quality beam for the production running, start from the tagger dump (see instructions on the right)
 +
* Hall-C is planning to perform BCM calibrations. If beam for Hall-B is on the tagger dump, we can continue with beam tune. If the beam is on Faraday cup, we should turn beam off and wait (for about 1 hour) until Hall-C finishes the calibration.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position