Line 135: Line 135:
 
-->
 
-->
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position
+
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and beam to Hall-B is established, perform 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within few 10s micron), precede with production running.
 
** Plan for Hall-A is to start setting up for beam delivery on Monday, October 11, 9 am. We will be down at least 4 hours (most likely a shift).
 
** Plan for Hall-A is to start setting up for beam delivery on Monday, October 11, 9 am. We will be down at least 4 hours (most likely a shift).
  
Line 247: Line 247:
 
#* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and on the 2H00 and 2H02 BPMS.
 
#* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and on the 2H00 and 2H02 BPMS.
 
#* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to restore corrector values. At this point don't accept any CW beam, until the beam spot is visible on Downstream Viewer.
 
#* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to restore corrector values. At this point don't accept any CW beam, until the beam spot is visible on Downstream Viewer.
#* If the MCC operator is not able to tune the beam for more than 30 minutes, then notify RC!
+
#* If the MCC operator is not able to tune the beam for more than 15 minutes, then notify RC!
 
#* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/1/1e/HPS_beam_estab.pdf] to establish beam to the electron dump.  
 
#* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/1/1e/HPS_beam_estab.pdf] to establish beam to the electron dump.  
 
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b>
 
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b>
#* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.3,Y=-1.) and on 2H02(X=-2.7,Y=-0.90). Use the 2.82 mm SVT collimator. (positions changed 10/3/21 by mg)</font></b>.  
+
#* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration)<b>, then gradually increase to 100 nA. For orbit lock positions on <font color=red>2H00(X=0.3,Y=-1.) and on 2H02(X=-2.7,Y=-0.90). Use the 2.82 mm SVT collimator. (positions changed 10/3/21 by mg)</font></b>.  
#* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Beam profile using 2H01A and 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3903891]) to compare.
+
#* Tune beam profile at HPS using measured widths 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Compare the beam profile measured with 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3903891]).
 
#* Check and log the beam spot on chromax viewer
 
#* Check and log the beam spot on chromax viewer
 
#* The halo counter rates before HPS must be very low:  
 
#* The halo counter rates before HPS must be very low:  