== Run Plan October 7 - 12, 2021 ==
 
== Run Plan October 7 - 12, 2021 ==
  
<!-- * Restore physics quality beam for the production running, start from the tagger dump (see instructions on the right)
+
* Restore physics quality beam for the production running after Hall-A setup is done. Start from the tagger dump (see instructions on the right).
* Special runs: ''' After October 7 morning run ends'''
+
** Plan for Hall-A is to start setting up for beam delivery on Monday, October 11, 4 pm. We will be down for at least 4 hours (most likely a shift).
 +
<!--* Special runs: ''' After October 7 morning run ends'''
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.  
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.  
 
** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the  
 
** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the  
Line 135: Line 136:
 
-->
 
-->
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and beam to Hall-B is established, perform 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within few 10s micron), precede with production running.
+
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
** Plan for Hall-A is to start setting up for beam delivery on Monday, October 11, 9 am. We will be down at least 4 hours (most likely a shift).
 
  
  

Revision as of 14:35, 11 October 2021