== Run Plan October 11 - 14, 2021 ==
 
== Run Plan October 11 - 14, 2021 ==
  
* Restore physics quality beam for the production running after Hall-A setup is done. Start from the tagger dump (see instructions on the right).
+
* Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC -
** Plan for Hall-A is to start setting up for beam delivery on Monday, October 11, 4 pm. We will be down for at least 4 hours (most likely a shift).
+
** if changes to the beam are substantial, start from the tagger dump (see instructions on the right)
 +
** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when beam is back to verify beam quality (see instructions) and proceed with the production data taking.
 +
** Plan for Hall-A is to start beam delivery on swing shift Tuesday.  
 
<!--* Special runs: ''' After October 7 morning run ends'''
 
<!--* Special runs: ''' After October 7 morning run ends'''
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.  
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.  
Line 136: Line 138:
 
-->
 
-->
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 +
** if the beam is down for RF or separator or other issues that will not alter the beam trajectory to Hall-B for less than 30 min, do not end the run instead pause DAQ with: <font color=red> tcpClient hps11 'tsDisableTriggerSource(0)' </font>, retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and un-pause DAQ  <font color=red> tcpClient hps11 'tsEnableTriggerSource()'</font>.
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
  