== Run Plan October 11 - 14, 2021 == | == Run Plan October 11 - 14, 2021 == | ||
− | * Restore physics quality beam for the production running after Hall-A setup is done. | + | * Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC - |
− | ** Plan for Hall-A is to start | + | ** if changes to the beam are substantial, start from the tagger dump (see instructions on the right) |
+ | ** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when beam is back to verify beam quality (see instructions) and proceed with the production data taking. | ||
+ | ** Plan for Hall-A is to start beam delivery on swing shift Tuesday. | ||
<!--* Special runs: ''' After October 7 morning run ends''' | <!--* Special runs: ''' After October 7 morning run ends''' | ||
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''. | ** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''. | ||
Line 136: | Line 138: | ||
--> | --> | ||
* '''Take production data taking''': 120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours. | * '''Take production data taking''': 120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours. | ||
+ | ** if the beam is down for RF or separator or other issues that will not alter the beam trajectory to Hall-B for less than 30 min, do not end the run instead pause DAQ with: <font color=red> tcpClient hps11 'tsDisableTriggerSource(0)' </font>, retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and un-pause DAQ <font color=red> tcpClient hps11 'tsEnableTriggerSource()'</font>. | ||
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running. | ** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running. | ||