Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 138: Line 138:
 
-->
 
-->
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
** if the beam is down for RF or separator or other issues that will not alter the beam trajectory to Hall-B for less than 30 min, do not end the run instead pause DAQ with: <font color=red> tcpClient hps11 'tsDisableTriggerSource(0)' </font>, retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and un-pause DAQ  <font color=red> tcpClient hps11 'tsEnableTriggerSource()'</font>.
+
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ with:  
 +
***<font color=red> tcpClient hps11 'tsDisableTriggerSource(0)' </font>, retract the SVT to 3 mm, leave the bias voltages ON.  
 +
** After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and un-pause DAQ   
 +
***<font color=red> tcpClient hps11 'tsEnableTriggerSource()'</font>.
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
  

Revision as of 16:38, 12 October 2021


[edit]


Svtpic.png

Ecalpic.png