Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 138: Line 138:
 
-->
 
-->
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ by running the script <font color=red> tcpClient hps11 'tsDisableTriggerSource(0)' </font> on <b> clondaq7 </b>
+
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ by running the script <font color=red> tcpClient hps11 'tsDisableTriggerSource(0)' </font> on <b> clondaq7 </b>.
*** then retract the SVT to 3 mm, leave the bias voltages ON.  
+
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and un-pause DAQ  by running <font color=red> tcpClient hps11 'tsEnableTriggerSource()'</font> on <b> clondaq7 </b>.
*** after the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and un-pause DAQ  by running <font color=red> tcpClient hps11 'tsEnableTriggerSource()'</font> on <b> clondaq7 </b>.
 
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
  

Revision as of 20:48, 12 October 2021


[edit]


Svtpic.png

Ecalpic.png