== Run Plan October 11 - 14, 2021 ==
+
== Run Plan October 13 - 14, 2021 ==
  
 +
* Hall-A will come up on swing shift, Wednesday, Oct.13day.
 
* Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC -  
 
* Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC -  
 
** if changes to the beam are substantial, start from the tagger dump (see instructions on the right)
 
** if changes to the beam are substantial, start from the tagger dump (see instructions on the right)
** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when beam is back to verify beam quality (see instructions) and proceed with the production data taking.
+
** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when the beam is back to verify beam quality (see instructions) and proceed with the production data taking.
** Plan for Hall-A is to start beam delivery on swing shift Tuesday.  
+
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 +
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font>
 +
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font>
 +
** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font>
 
<!--* Special runs: ''' After October 7 morning run ends'''
 
<!--* Special runs: ''' After October 7 morning run ends'''
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.  
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.  
Line 137: Line 141:
 
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.
 
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.
 
-->
 
-->
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font>
 
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font>
 
** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font>
 
  
 
<!--  
 
<!--  
Line 150: Line 150:
 
===Hall Access Items (Monday, October 11):===
 
===Hall Access Items (Monday, October 11):===
 
* Refill SVT chiller, check ECal and FEB chiller water levels, refill if needed - experts
 
* Refill SVT chiller, check ECal and FEB chiller water levels, refill if needed - experts
* Module for CLAS12 SVT will come out - Rafo
+
* NIM crate for the CLAS12 SVT and the hodo PMT should come out, contact radcon - Rafo
  
 
<!--
 
<!--