Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 141: Line 141:
 
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.
 
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.
 
-->
 
-->
 
+
* Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
<!--
 
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ by running the script <font color=red> tcpClient hps11 'tsDisableTriggerSource(0)' </font> on any clon machine.
 
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and un-pause DAQ  by running <font color=red> tcpClient hps11 'tsEnableTriggerSource()'</font> on any clon machine.-->
 
** Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
 
  
  

Revision as of 15:34, 13 October 2021


[edit]


Svtpic.png

Ecalpic.png