== Run Plan October 13 - 14, 2021 ==
 
== Run Plan October 13 - 14, 2021 ==
  
* Hall-A will come up on swing shift, Wednesday, Oct.13day.  
+
<!--* Hall-A will come up on swing shift, Wednesday, Oct.13day.  
 
* Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC -  
 
* Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC -  
 
** if changes to the beam are substantial, start from the tagger dump (see instructions on the right)
 
** if changes to the beam are substantial, start from the tagger dump (see instructions on the right)
** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when the beam is back to verify beam quality (see instructions) and proceed with the production data taking.
+
** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when the beam is back to verify beam quality (see instructions) and proceed with the production data taking.-->
 +
* Special runs: ''' After October 15 morning run ends'''
 +
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.
 +
** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the
 +
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.
 +
 
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font>
 
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font>
 
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font>  
 
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font>  
 
** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font>
 
** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font>
<!--* Special runs: ''' After October 7 morning run ends'''
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.
 
** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the
 
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.
 
-->
 
 
* Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
 
* Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
  