== Run Plan October 13 - 14, 2021 == | == Run Plan October 13 - 14, 2021 == | ||
− | * Hall-A will come up on swing shift, Wednesday, Oct.13day. | + | <!--* Hall-A will come up on swing shift, Wednesday, Oct.13day. |
* Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC - | * Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC - | ||
** if changes to the beam are substantial, start from the tagger dump (see instructions on the right) | ** if changes to the beam are substantial, start from the tagger dump (see instructions on the right) | ||
− | ** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when the beam is back to verify beam quality (see instructions) and proceed with the production data taking. | + | ** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when the beam is back to verify beam quality (see instructions) and proceed with the production data taking.--> |
+ | * Special runs: ''' After October 15 morning run ends''' | ||
+ | ** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''. | ||
+ | ** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the | ||
+ | ** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events. | ||
+ | |||
* '''Take production data taking''': 120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours. | * '''Take production data taking''': 120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours. | ||
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font> | ** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font> | ||
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font> | ** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font> | ||
** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font> | ** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
* Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running. | * Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running. | ||