Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 131: Line 131:
 
* Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC -  
 
* Restore physics quality beam for the production running after Hall-A setup is done. Consult with MCC -  
 
** if changes to the beam are substantial, start from the tagger dump (see instructions on the right)
 
** if changes to the beam are substantial, start from the tagger dump (see instructions on the right)
** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when the beam is back to verify beam quality (see instructions) and proceed with the production data taking.-->
+
** if the setup of the beam delivery to Hall-A will not affect our beam, perform 2H02 harp scan when the beam is back to verify beam quality (see instructions) and proceed with the production data taking.
 
* Special runs: ''' After October 15 morning run ends'''
 
* Special runs: ''' After October 15 morning run ends'''
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.  
 
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''.  
 
** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the  
 
** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the  
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.
+
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.-->
  
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.
 
* '''Take production data taking''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.

Revision as of 12:28, 16 October 2021


[edit]


Svtpic.png

Ecalpic.png