Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 143: Line 143:
 
* Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
 
* Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.
  
===At 8 am onMonday, October 18, beam will be OFF for the pass change. Hall-B goes to 1st-pass, Hall-A takes 2nd-pass===
+
===At 8 am on Monday, October 18, beam will be OFF for the pass change. Hall-B goes to 1st-pass, Hall-A takes 2nd-pass===
  
  

Revision as of 08:42, 17 October 2021


[edit]


Svtpic.png

Ecalpic.png