Line 137: | Line 137: | ||
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events. | ** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events. | ||
− | * '''Take production data | + | * '''Take production data''': 120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.--> |
* '''Setup production data taking''': Start 50 nA beam on the 8 um W target, PROD77 configuration, production trigger '''hps_1.9_v2_3.trg'''. Turn ON detectors, bring SVT in to 0.5 mm. Start the run and check occupancies. Increase the beam current (up to 100 nA) until you reach occupancies of ~0.15% for L0t and L0b. End run and start a new one. | * '''Setup production data taking''': Start 50 nA beam on the 8 um W target, PROD77 configuration, production trigger '''hps_1.9_v2_3.trg'''. Turn ON detectors, bring SVT in to 0.5 mm. Start the run and check occupancies. Increase the beam current (up to 100 nA) until you reach occupancies of ~0.15% for L0t and L0b. End run and start a new one. | ||
− | * '''Take production data | + | * '''Take production data''': Beam current as found above, target 8 um W. Each run should last about 4 hours. After one run take a Moller trigger run - hps_1.9_Moller_v2_3.trg, if rates are too high, call Valery to adjust the pre-scale factors. |
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font> | ** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font> | ||
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font> | ** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font> |