* '''Take production data''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.-->
 
* '''Take production data''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.-->
* '''Setup production data taking''':  Start 50 nA beam on the 8 um W target, PROD77 configuration, production trigger '''hps_1.9_v2_3.trg'''. Turn ON detectors, bring SVT in to 0.5 mm. Start the run and check occupancies. Increase the beam current (up to 100 nA) until you reach occupancies of ~0.15% for L0t and L0b. End run and start a new one.
+
* '''Setup production data taking''':  Start 50 nA beam on the 8 um W target, PROD77 configuration, production trigger '''hps_1.9_v2_3.trg'''. Turn ON detectors, bring SVT in to 0.5 mm. Start the run and check occupancies. Increase the beam current (up to 100 nA) until you reach occupancies of ~1.5% for L0t and L0b. End run and start a new one.
 
* '''Take production data''': Beam current as found above, target 8 um W. Each run should last about 4 hours. After one run take a Moller trigger run -  hps_1.9_Moller_v2_3.trg, if rates are too high, call Valery to adjust the pre-scale factors.  
 
* '''Take production data''': Beam current as found above, target 8 um W. Each run should last about 4 hours. After one run take a Moller trigger run -  hps_1.9_Moller_v2_3.trg, if rates are too high, call Valery to adjust the pre-scale factors.  
 
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font>
 
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font>

Revision as of 16:59, 19 October 2021


[edit]


Svtpic.png

Ecalpic.png