Line 154: | Line 154: | ||
## Notify RC or SVT expert. We want someone at MCC to monitor progress. | ## Notify RC or SVT expert. We want someone at MCC to monitor progress. | ||
## SVT must be open, collimator must be in. | ## SVT must be open, collimator must be in. | ||
− | # When decent beams have been reestablished, calibrate downstream | + | # When decent beams have been reestablished, calibrate downstream strip-line BPMS: |
− | # Post calibration, require good spot on Chromax, low counts on halo counters, have MCC turn on orbit locks, and then set-up chicane. | + | ## With orbit locks off, ask MCC to slowly ramp up the current of the beam (5 - 60 nA). Look on the strip charts for a correlation between current and beam position. |
+ | ## Make a log book entry of the results. The data can be analyzed later from the archives, but we want to know if there is a region where we can run with orbit locks on, or if orbit locks can only be used for a fixed current. | ||
+ | # Post calibration, require good spot on Chromax, low counts on halo counters, have MCC turn on orbit locks if current is stable, and then set-up chicane. | ||
+ | ## Note: '''If you change current, turn orbit locks off first''' | ||
# Scan target vertically and horizontally, measure halo rates vs target; | # Scan target vertically and horizontally, measure halo rates vs target; | ||
# Call SVT expert. Expert will turn on SVT. | # Call SVT expert. Expert will turn on SVT. |
Revision as of 08:42, 18 April 2015
Important Phone NumbersShift ScheduleShift-Taker's Checklist (old)Hot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Maurik Holtrop
PDL: Stepan StepanyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page SVT expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert.
Acceptable Beam Conditions:Before accepting beam, make sure all the conditions are met - beam profile and halo rates are what you expect (or very close to it). If unsure call to RC, PDL, or beamline expert!
Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI. Every Run:
|
Run Plan: April 17-22, 2015 (day/swing/owl)April 17 Swing and Saturday April 18 Owl are cancelled. Saturday April 18 Day shift should count on coming in. During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. Friday day shift may happen, so be prepared. Short Term Schedule: Restore Beam We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the faraday cup, then the alcove. Before sending beam to the alcove, call the RC.
When we're back, proceed with program MCC works on beam optics and matching, and tunes beam to tagger
Standards are on this page: ACCEPTABLE BEAM CONDITIONS.
Restore Beam to the Hall-B Dump
Energize Chicane
Be very careful when changing magnet currents when beams are on. Must enter new current ACCURATELY. Small steps (few amps) only.
Are we centered? Beamline Expert should enter new target positions if not.
Subsystem Commissioning Studies. Begin Data Taking. DO NOT RUN MORE THAN 30 MINUTES ABOVE 50 nA WITHOUT THE BEAM BLOCKER
|
Trigger | |||
---|---|---|---|
FADC | GTP | ||
NSB/NSA | 20/100 ns | Samples Before/After | 3/3 |
Readout Threshold | 12 ADC | Seed Threshold | 80 MeV |
SSP | |||
Singles-0 | Singles-1 | ||
# Hits | >2 | >2 | |
Cluster Energy | 0.1 < E < 2.5 GeV | 0.5 < E < 1.2 GeV | |
Pairs-0 | Pairs-1 | ||
Cluster Energy | 0.9 < E < 1.3 GeV | 0.1 < E < 0.6 GeV | |
Energy Sum | 0.19 GeV < E < 2.2 GeV | 0.21 < E < 1.0 GeV | |
Energy Difference | dE < 1.2 GeV | dE < 0.65 GeV | |
Coplanarity | N/A | Theta < 40 deg | |
Energy Slope | N/A | > 0.6 GeV | |
TI Prescales | |||
Singles-0 | Singles-1 | Pairs-0 | Pairs-1 |
0 | 0 | 0 | 0 |
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |