Difference between revisions of "The HPS Run Wiki"
Line 120: | Line 120: | ||
# Beam can be accepted at this level if it is within 20% of previous standards | # Beam can be accepted at this level if it is within 20% of previous standards | ||
# Halo counters TAG-L/T/T2 should be ~10Hz/nA [https://logbooks.jlab.org/entry/3326723], | # Halo counters TAG-L/T/T2 should be ~10Hz/nA [https://logbooks.jlab.org/entry/3326723], | ||
− | <b> | + | <b>While MCC degauss the tagger magnet, turn the chicane ON</b> |
# Strictly follow the procedure in the beam line manual! | # Strictly follow the procedure in the beam line manual! | ||
− | <b> | + | <b>Before sending beam to the Faraday cup</b> |
# Check 3mm collimator is IN | # Check 3mm collimator is IN | ||
# Check HPS target is OUT | # Check HPS target is OUT | ||
− | # Tune beam profile with 2H02A harp scan to be wide in X-direction and narrow in Y (see ref [https://logbooks.jlab.org/entry/3334783]) | + | # Check SVT is out (position 0 mm) |
+ | <b>Beam to the Faraday cup</b> | ||
+ | # Tune beam profile with 2H02A harp scan to be wide in X-direction and narrow in Y (see ref [https://logbooks.jlab.org/entry/3334783]) | ||
+ | # Check the beam spot on chromax viewer | ||
# The halo counter rates before HPS must be low: | # The halo counter rates before HPS must be low: | ||
#* UPS-L and UPS-R few Hz/nA, | #* UPS-L and UPS-R few Hz/nA, | ||
Line 152: | Line 155: | ||
− | == Run Plan: April | + | == Run Plan: April 23-30, 2015 (day/swing/owl) == |
− | During week days, Mon-Thursday, there will be no Day shifts due to work in the hall | + | During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. |
− | |||
'''<font size=3>Short Term Schedule: Study Trigger and SVT running conditions.</font>''' | '''<font size=3>Short Term Schedule: Study Trigger and SVT running conditions.</font>''' | ||
− | We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then the alcove and Faraday cup screen | + | We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then the alcove and Faraday cup screen. See detailed instructions in the left pannel. |
− | + | ||
− | |||
− | |||
− | |||
− | |||
# Require good spot on Chromax, <b>low counts on halo counters</b>, have MCC turn on orbit locks if current is stable and above 15 nA, and then set-up chicane. | # Require good spot on Chromax, <b>low counts on halo counters</b>, have MCC turn on orbit locks if current is stable and above 15 nA, and then set-up chicane. | ||
## Note: '''If you change beam current current, turn orbit locks off first''', there is a current - position dependence on the stripline BPMs 2H00 and 2H02. | ## Note: '''If you change beam current current, turn orbit locks off first''', there is a current - position dependence on the stripline BPMs 2H00 and 2H02. |
Revision as of 14:14, 25 April 2015
Important Phone NumbersShift ScheduleShift-Taker's Checklist (old)Hot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Raphael Dupre
PDL: Stepan StepanyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page SVT expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert.
Acceptable Beam Conditions:To establish good beam conditions first send beam to the tagger dump (ask MCC to turn ON the tagger).
While MCC degauss the tagger magnet, turn the chicane ON
Before sending beam to the Faraday cup
Beam to the Faraday cup
Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI. Every Run:
|
Run Plan: April 23-30, 2015 (day/swing/owl)During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. Short Term Schedule: Study Trigger and SVT running conditions. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then the alcove and Faraday cup screen. See detailed instructions in the left pannel.
When we're back, proceed with program
MCC works on beam optics and matching, and tunes beam to tagger
Standards are on this page: ACCEPTABLE BEAM CONDITIONS.
Restore Beam to the Hall-B Dump
Energize Chicane
Be very careful when changing magnet currents when beams are on. Must enter new current ACCURATELY. Small steps (few amps) only.
Are we centered? Beamline Expert should enter new target positions if not.
Subsystem Commissioning Studies. Begin Data Taking. DO NOT RUN MORE THAN 30 MINUTES ABOVE 50 nA WITHOUT THE BEAM BLOCKER
|
Trigger | |||
---|---|---|---|
FADC | GTP | ||
NSB/NSA | 20/100 ns | Samples Before/After | 3/3 |
Readout Threshold | 12 ADC | Seed Threshold | 80 MeV |
SSP | |||
Singles-0 | Singles-1 | ||
# Hits | >2 | >2 | |
Cluster Energy | 0.1 < E < 2.5 GeV | 0.5 < E < 1.2 GeV | |
Pairs-0 | Pairs-1 | ||
Cluster Energy | 0.09 < E < 1.3 GeV | 0.1 < E < 0.6 GeV | |
Energy Sum | 0.19 GeV < E < 2.2 GeV | 0.21 < E < 1.0 GeV | |
Energy Difference | dE < 1.2 GeV | dE < 0.65 GeV | |
Coplanarity | N/A | Theta < 40 deg | |
Energy Slope | N/A | > 0.6 GeV | |
TI Prescales | |||
Singles-0 | Singles-1 | Pairs-0 | Pairs-1 |
0 | 0 | 0 | 0 |
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |