== PDL: Stepan Stepanyan == | == PDL: Stepan Stepanyan == | ||
− | == <font color=blue><b> Run Plan | + | == <font color=blue><b> Run Plan for April 23-30, 2015 </b></font>== |
During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. | During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. | ||
− | + | We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. | |
− | + | === Short term schedule: === | |
− | |||
# Turn ON the ECal and check for normal scalers (ref: [https://logbooks.jlab.org/entry/3334812]) | # Turn ON the ECal and check for normal scalers (ref: [https://logbooks.jlab.org/entry/3334812]) | ||
− | # Call SVT expert. Expert will check conditions and turn on SVT. <b>Only SVT expert | + | # Call SVT expert. Expert will check conditions and turn on SVT. <b>Only SVT expert should move the SVT!</b> |
− | # Take data | + | # Take data at 40 nA for few hours, we need several good runs |
+ | #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts if needed) | ||
+ | #* Log errors for each DAQ crash | ||
+ | #* Use HpsTrigCommV1M1.trg trigger file | ||
+ | # Take trigger commissioning data runs. See [[Media:HPS_TriggerCommissioning_March2015.pdf|Valery's note]] on the run Wiki under commissioning trigger. | ||
+ | # If orbit locks are on, call Rafayel for beam trip study. Take 4 hours of beam trip data with wire up; take 4 hours of beam trip data with wire down. | ||
+ | # In absence of other requests, take data at 40 nA. Be sure to block Faraday cup if higher current. | ||
− | + | === Miscellaneous Notes: === | |
− | + | # <b> If you change beam current current, turn orbit locks off first, there is a current - position dependence on the stripline BPMs 2H00 and 2H02 </b> | |
− | + | # Do NOT change magnet currents when beam is on | |
− | + | # Do not run more than 30 minutes above 50 nA without the beam blocker put beam blocker in for long running at high current | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| valign=top | | | valign=top | | ||
+ | <center> <font color=red size=4> <b> 1st rule of HPS: Document all your work in the logbook! </b> </font> </center> | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
===Every Shift:=== | ===Every Shift:=== |
Revision as of 15:23, 25 April 2015
[edit]
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Raphael Dupre
PDL: Stepan StepanyanRun Plan for April 23-30, 2015During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Every Shift:
SVT Instructions
Acceptable Beam Conditions:
|
Long Term Schedule Proposal PowerPoint
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |