Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 104: | Line 104: | ||
#* Log errors for each DAQ crash | #* Log errors for each DAQ crash | ||
#* Use HpsTrigCommV1M1.trg trigger file | #* Use HpsTrigCommV1M1.trg trigger file | ||
− | |||
# If orbit locks are on, call Rafayel for <b> beam trip study</b>. Take 4 hours of beam trip data with wire up; take 4 hours of beam trip data with wire down. | # If orbit locks are on, call Rafayel for <b> beam trip study</b>. Take 4 hours of beam trip data with wire up; take 4 hours of beam trip data with wire down. | ||
# In absence of other requests, <b> take data at 40 nA</b>. Be sure to block Faraday cup if higher current. | # In absence of other requests, <b> take data at 40 nA</b>. Be sure to block Faraday cup if higher current. |
Revision as of 07:14, 26 April 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Raphael Dupre
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for April 23-30, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Every Shift:
SVT Instructions:
Acceptable Beam Conditions:
|
Long Term Schedule Proposal PowerPoint
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |