Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 131: | Line 131: | ||
# Shortly after start of run, [https://logbooks.jlab.org/entry/3337933 Check Cluster Latency] | # Shortly after start of run, [https://logbooks.jlab.org/entry/3337933 Check Cluster Latency] | ||
# After end of a Good run, [https://logbooks.jlab.org/entry/3337942 Copy the Run To Tape] | # After end of a Good run, [https://logbooks.jlab.org/entry/3337942 Copy the Run To Tape] | ||
− | # See the whiteboard for everything else. | + | # See the whiteboard for everything else that should be done on a per-run basis. |
===Setting up chicane for E=1.056 GeV=== | ===Setting up chicane for E=1.056 GeV=== | ||
Line 151: | Line 151: | ||
**To be useful, this requires DAQ Prestarted and ECAL Scaler GUIs running and monitored. | **To be useful, this requires DAQ Prestarted and ECAL Scaler GUIs running and monitored. | ||
*HV should be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. | *HV should be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. | ||
− | ** | + | **Only after stable beam established to Faraday Cup can HV can be turned ON. |
*HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | *HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | ||
Revision as of 17:01, 2 May 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Takashi Maruyama
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 2 - 8, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Every Shift:
Every Run:
Setting up chicane for E=1.056 GeV
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |