===Setting up chicane for E=1.056 GeV=== | ===Setting up chicane for E=1.056 GeV=== | ||
− | + | Note: This requires Beam Permit and no beam to HPS / Faraday Cup. This can be done before or during tuning beam on the tagger dump. | |
# Turn on chicane power supplies following provided instructions on the documentation page on "Turning Chicane ON/OFF" | # Turn on chicane power supplies following provided instructions on the documentation page on "Turning Chicane ON/OFF" | ||
# When supplies are ready - set the analyzing magnet power supply (Hall-B PS power supply) to I=369.6A | # When supplies are ready - set the analyzing magnet power supply (Hall-B PS power supply) to I=369.6A |
Revision as of 09:39, 12 May 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 2 - 8, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Every Shift:
Every Run:
Setting up chicane for E=1.056 GeVNote: This requires Beam Permit and no beam to HPS / Faraday Cup. This can be done before or during tuning beam on the tagger dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |