Spring 2016 @ 2 GeV:
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to March April 25, Weekends Only
Shifts are manned from Friday 2pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for April 1 - 25, 2016 (every weekend):Start close-up of the Hall at 3pm on Friday, April 1
When hall is closed, and regular shifts began, turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Important Notes:
Recovering from beam trips when running SVT at 0.5 mm:
INSERT WHAT SVT TO DO DURING LONG DOWN |
General Instructions:DAQ RECOVERYIf DAQ crashed/broken:
Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
|
Every Shift:
|
Every Run:
|
---|
.
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |