HPS 2016 run, February 4 to April 25, Weekends Only
Shifts are manned from Friday 2pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!

Bluejeans for Run Meetings on Thursdays and Fridays at 2pm

RC: Rafayel Paremuzyan

  • (757) 575-7540
  • 9 575 7540 from Counting Room

PDL: Harut Avakian

Run Plan for April 1 - 25, 2016 (every weekend):

Start close-up of the Hall at 3pm on Friday, April 1

  • See General Instructions on the right for details

When hall is closed, and regular shifts began, turn on the chicane

Establish beam to the tagger dump

  1. See "General Instructions" on the right for details
  2. Log screenshots of the ECal and main HPS scaler screens for reference when beam is established at the tagger

Bring beam to FC:

  1. Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.).
  2. Important Note: Before bringing beams to the FC, be sure that the SVT and ECal are off, the SVT fully retracted, the target out, and the 2.82 mm SVT collimator is in. All beam studies should be done in these conditions with beam currents of 30 nA.
  3. Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also make sure that Harp scans reproduce recent mean values of Beam X and and Y [1]. Vertically should be within 50 um match, horizontally 300 um should be enough.
  4. Restore ECal and Trigger
    • Turn on ECal
    • Record FADC rates with and without the 4 um target at 200 nA.
    • Call ECal expert to perform pedestal run
    • Trigger/DAQ expert checks trigger rates, DAQ, and deadtime with 200 nA beam on 4 um target. Record:
      1. main scaler screen
      2. ecal scaler gui
      3. trigger rate gui (requires DAQ Prestarted with v8_200nA.trg)
        • Live time should be >~90%
        • Total Trigger rate should be ~17 kHz.
  5. SVT Setting (call SVT expert in)
    • If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm
    • record occupancy, latency, data size, and deadtimes
  6. Record Production Data with 4um target @ 200 nA
    • Use Configuration HPS35 and Trigger v8_200nA.trg.
    • 150 Million events per run
    • Be sure to follow General Guidelines, especially instructions for Every Shift and Every Run below.
    • Monitor and record BPM 2H02 history carefully to insure stable beams.
      • If beams are not stable, get MCC to fix it!
    • Document any beam condition change and send scaler GUIs to HBLOG
  7. Special (to be scheduled by RC)
    • 3.93 mm collimator
      • Scan to center it (update epics records)
      • Empty target run to compare rates with 2.82 mm collimator
    • Quick no-collimator rate measurement

Important Notes:

  1. Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.

SVT RECOVERY PROCDURES

General Instructions:

DAQ RECOVERY

If DAQ crashed/broken:

  1. If the problem is with one of DPMs, then in clondaq3 machine look into /data/log directtory for corresponding dpm log file, e.g. dpm11.log, then copy the corresponding log file with different name e.g. cp /data/log/dpm11.log dpm11_crash_09_15_Apr_10.log
  2. Reboot DAQ completely..
  3. If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status.

Locking up the hall on Fridays

  • At 2pm check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm.
  • Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm:
    • Vacuum is good, magnet power supplies are turned ON and in remote mode, LCW is on.
  • Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems before the lockup.
  • When ready notify MCC to start sweep and lockup of the hall.
  • Make sure all necessary monitoring GUIs are up and running.
  • Make sure beam viewer screens are up.
  • When hall reaches "Beam Permit":

Establishing Acceptable Beam Conditions:

  1. Make sure SVT is retracted and both SVT and ECAL are OFF.
  2. First send beam to the tagger dump:
    • Check that beam type is set to "Photon" (HPS_EPICS->Beam->BTA).
    • Ask MCC to turn ON the tagger magnet and then deliver <10 nA beam.
    • Check the beam position on the tagger viewer, it should be approximately in the centre of the screen
    • Follow instructions under "Procedures" on the documentation tab for "Beamline"[2]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA.
    • Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([3],[4])
      • Positions on both harps should be within 1mm
      • Width on 2C21 should be <~0.1+/-0.05 mm
      • Width on tagger harp (2C24) <~0.35 +/- 0.1mm
    • Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [5]
  3. Before sending beam to the Faraday cup
    • Check that chicane GUI says "Chicane Ready"
    • Check that SVT protection collimator is ON
    • HPS target is OUT and ECAL HV is OFF
    • SVT is OUT (position=0.000 mm in main hps scaler screen) and HV is off (all red/green indicators RED in SVT bias GUI)
    • If any uncertainty, page the experts
    • The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert.
    • Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [6]. Make sure their values doesn't differ more than 100%. If there is a such difference, tell MCC about this.
  4. Send beam to the Faraday cup
    • If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and beam position and on 2H00 and 2H02 BPMS.
    • If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to put corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer.
    • If MCC operator is not able to tune the beam more than 30 minutes, then please notify RC

Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.

    • Ask MCC to establish 30 nA beam with HPS orbit locks on (We need HallBHPSOrb not HallBOrb configuration). For orbit lock positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. .
    • Tune beam profile at HPS using measured widths on 2H02A harp. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm for commissioning, and Y-width ~0.05 for physics running, and the tilt angle <15 degrees.
    • Check and log the beam spot on chromax viewer
    • The halo counter rates before HPS must be low:
      1. UPS-L and UPS-R few Hz/nA,
      2. The tagger counters should count less than Hz/nA and downstream counters should count ~Hz/nA
      3. The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [7]
    • Positions on BPMs must be close to what they were before [8]
    • Once all the above is achieved, turn ECAL HV ON to monitor and log ECal rates
    • Insert the 4um W target without turning off the beam.
  1. Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.


Every Shift:

  1. Follow run plan as outlined by RC
  2. If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  3. Keep shift summary up to date in HBLOG. Record all that happens.
    • Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly
    • Document any beam condition change and send scaler GUIs to HBLOG
    • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side.
    • Fill and submit the shift checklist in the logbook
  4. Perform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans SVT must be retracted and HV should be OFF.
  5. With any issue contact On-Call Experts or RC

Every Run:

  1. After "Go": Check SVT Occupancy
  2. Update the Run Spreadsheet
  3. Log screenshots of:
    • main scaler_hps display
    • ECAL FADC rate gui
    • Trigger rate gui
    • SVT and ECAL Monitoring pdfs
  4. After each run execute this script (replace RunNb by the actual run number):
    • hps2tapeAndDelete.sh RunNb
  5. All trigger files to be used by shifters are in HPS/Run2016


Spring 2016 @ 2 GeV:

.

Charge2016.png
Run Coordinator
Feb 3 - Feb 10 Stepan Stepanyan
Feb 10 - Feb 17 Takashi Maruyama
Feb 17 - Feb 24 John Jaros
Feb 24 - Mar 2 Raphaël Dupré
Mar 2 - Mar 9 Nathan Baltzell
Mar 9 - Mar 16 Maurik Holtrop
Mar 17 - Mar 24 Stepan Stepanyan
Mar 24 - Mar 30 Valery Kubarovsky
Mar 30 - Apr 6 Stepan Stepanyan
Apr 6 - Apr 15 Rafayel Paremuzyan
Apr 15 - Apr 20 John Jaros
Apr 20 - Apr 25 Valery Kubarovsky
Physics Division Liaison
Feb 3 - Mar 16 Harut Avagyan
Beamline
Feb 4 - Feb 10 F.X. Girod
Feb 10 - Feb 17 Stepan Stepanyan
Feb 17 - Feb 24 Rafo Paremuzyan
Feb 24 - Mar 2 Clive Field
Mar 2 - Mar 9 Takashi Maruyama
Mar 9 - Mar 16 John Jaros
Mar 16 - Apr 6 Stepan Stepanyan
Apr 6 - Apr 18 Rafayel Paremuzyan
Apr 18 - Apr 25 Stepan Stepanyan
SlowControls
Feb 4 - Feb 11 Stepan Stepanyan
Feb 12 - Feb 18 Sho Uemura
Feb 19 - Feb 25 Bryan McKinnon
Feb 26 - Mar 10 Hovanes Egiyan
Mar 11 - Apr 21 Nathan Baltzell
Apr 21 - Apr 25 Hovanes Egiyan
ECAL
Feb 2 - Feb 9 Holly Vance
Feb 9 - Feb 16 Nathan Baltzell
Feb 16 - Feb 23 Raphaël Dupré
Feb 23 - Mar 1 Andrea Celentano
Mar 1 - Mar 15 Gabriel Charles
Mar 17 - Apr 20 Nathan Baltzell
Apr 20 - Apr 25 Holly Vance
SVT
Feb 4 - Feb 12 Matt Graham
Feb 12 - Feb 19 Sho Uemura
Feb 19 - Feb 26 Matt Solt
Feb 26 - Mar 4 Vitaliy Fadeyev
Mar 4 - Mar 14 Tim Nelson
Mar 17 - Mar 28 Matt Solt
DAQ
24/7/365 Sergey Boyarinov



Spring 2015 Final @ 1 GeV:

.

Charge.png


System/Person Pager/Phone Number
Run Coordinator (757) 575-7540 (cell)
Physics Div. Liaison (757) 876-1789 (cell)
MCC-OPS 7048
Crew Chief 7045
Crew Chief 9-879-3367 (cell)
Program Deputy 9-876-7997 (cell)
Gate House Guard 5822
DAQ/Online (757) 869-2188 (cell)
SVT (757) 541-7539 (cell)
ECAL (757) 810-1489 (cell)
Slow Controls (757) 748-6922 (cell)
Beamline (757) 303-3996 (cell)
Engineering (757) 748-5048