The HPS Run Wiki
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Raphael Dupre
PDL: Stepan StepanyanRun Plan: April 23-30, 2015During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. Short Term Schedule: Study Trigger and SVT running conditions. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then the alcove and Faraday cup screen. See detailed instructions in the left pannel.
Then, proceed with program Notes: If you change beam current current, turn orbit locks off first, there is a current - position dependence on the stripline BPMs 2H00 and 2H02. Do NOT change magnet currents when beam is on. DO NOT RUN MORE THAN 30 MINUTES ABOVE 50 nA WITHOUT THE BEAM BLOCKER
|
General Instructions:Every Shift:
SVT Instructions
Acceptable Beam Conditions:
|
|
|
|
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |