Attended: Moskov, Sean, Mikhail, Justin, Hovanes, and Igor.


  • On October 14th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [1]
  • On December 9th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [2]
  • On January 20th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [3]
  • Mikhail's slides are in [4]
  • SIMENS magnit paper [5]
  • SIMENS magnet document [6]