Difference between revisions of "January 31st, 2022"

From kl project
Jump to navigation Jump to search
Line 1: Line 1:
 
<b>Attended</b>: ''Moskov'', ''Sean'', ''Mikhail'', ''Justin'', and ''Igor''.
 
<b>Attended</b>: ''Moskov'', ''Sean'', ''Mikhail'', ''Justin'', and ''Igor''.
 +
  
 
* On January 20th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/January_20,_2022_KLONG_Phase_II_Design_Meeting#Action_Items]
 
* On January 20th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/January_20,_2022_KLONG_Phase_II_Design_Meeting#Action_Items]

Revision as of 09:07, 31 January 2022

Attended: Moskov, Sean, Mikhail, Justin, and Igor.


  • On January 20th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • Mikhail's slides are in [2]
  • SIMENS magnit paper [3]
  • SIMENS magnet document [4]


  • On January 21st, Moskov had a 128-ns meeting with injector folks (Reza Kazimi, Alicia Hofler, Geoffrey Krafft, Shukui Zhang, Max Bruker, and Joe Grames). Sunil's slides are here [5]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run.