* On December 5th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tagger vault with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_December_5,_2022]. | * On December 5th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tagger vault with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_December_5,_2022]. | ||
:* [[media:temp_calcs_by_tim_12_05_2022.pdf | Temperature calculations]] (''Tim'') | :* [[media:temp_calcs_by_tim_12_05_2022.pdf | Temperature calculations]] (''Tim'') | ||
− | :* | + | :* [[media:temp_CPSDOSESTUD.pdf | Dose rates around CPS and material lifetime. CPS optimizatiion.]] (''Vitaly'') |
:* [[media:pavels_model_12_05_2022.pptx | Updates to Pavel's model]] (''Pavel'') | :* [[media:pavels_model_12_05_2022.pptx | Updates to Pavel's model]] (''Pavel'') | ||
:* [[media:magnet_study_opera_12_05_2022.pdf | Magnet studies with OPERA]] (''Hovanes''). | :* [[media:magnet_study_opera_12_05_2022.pdf | Magnet studies with OPERA]] (''Hovanes''). |
Revision as of 12:24, 15 December 2022
Attended: Moskov, Sean, Mikhail, Justin, Eugene, Hovanes, and Igor.
- On November 28th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [1].
- Updates on conceptual design (Vitaly)
- Temperature calculations (Tim)
- Alternative model (Pavel)
- Extra material to browse (Pavel)
- Magnet studies with OPERA (Hovanes)
- On December 2nd, Tanja Horn had a CPS meeting (main focus is CPS for Hall C, incuding stress/thermal calculations) [2].
- On December 5th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [3].
- Temperature calculations (Tim)
- Dose rates around CPS and material lifetime. CPS optimizatiion. (Vitaly)
- Updates to Pavel's model (Pavel)
- Magnet studies with OPERA (Hovanes).
- On December 5th, Patrizia sent us a Charge for ERR Charge for ERR-I.
- On December 8th, we had a Hovanes KPT meeting for to prepare for ERR [4].
- On December 12th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [5].