Difference between revisions of "January 31st, 2022"
Jump to navigation
Jump to search
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | <b>Attended</b>: and ''Igor''. | + | <b>Attended</b>: ''Moskov'', ''Sean'', ''Mikhail'', ''Justin'', ''Hovanes'', and ''Igor''. |
− | * On January 20th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor | + | |
+ | * On October 14th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/October_14,_2021_KLONG_Design_Meeting] | ||
+ | |||
+ | * On December 9th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/December_09,_2021_KLONG_Design_Meeting] | ||
+ | |||
+ | * On January 20th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/January_20,_2022_KLONG_Phase_II_Design_Meeting#Action_Items] | ||
* ''Mikhail's'' slides are in [https://wiki.jlab.org/klproject/images/c/c9/KLF_2022_v0.pptx] | * ''Mikhail's'' slides are in [https://wiki.jlab.org/klproject/images/c/c9/KLF_2022_v0.pptx] | ||
Line 8: | Line 13: | ||
* SIMENS magnet document [https://wiki.jlab.org/klproject/images/7/72/MHRA04133_v21.pdf] | * SIMENS magnet document [https://wiki.jlab.org/klproject/images/7/72/MHRA04133_v21.pdf] | ||
+ | |||
+ | |||
+ | * On January 21st, ''Moskov'' had a ''128-ns'' meeting with injector folks (''Reza Kazimi'', ''Alicia Hofler'', ''Geoffrey Krafft'', ''Shukui Zhang'', ''Max Bruker'', and ''Joe Grames''). ''Sunil's'' slides are here [https://wiki.jlab.org/klproject/images/3/37/Presentation5.pdf]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run. |
Latest revision as of 11:33, 12 January 2023
Attended: Moskov, Sean, Mikhail, Justin, Hovanes, and Igor.
- On October 14th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [1]
- On December 9th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [2]
- On January 20th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [3]
- Mikhail's slides are in [4]
- SIMENS magnit paper [5]
- SIMENS magnet document [6]
- On January 21st, Moskov had a 128-ns meeting with injector folks (Reza Kazimi, Alicia Hofler, Geoffrey Krafft, Shukui Zhang, Max Bruker, and Joe Grames). Sunil's slides are here [7]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run.