Difference between revisions of "April 4th, 2023"
Jump to navigation
Jump to search
(Created page with "<b>Attended</b>: ... and ''Igor''. * On March 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/...") |
|||
Line 4: | Line 4: | ||
* On March 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_20,_2023]. | * On March 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_20,_2023]. | ||
:* Results of meeting with Fermilab group (''Moskov'') | :* Results of meeting with Fermilab group (''Moskov'') | ||
− | :* | + | :* [[media:CPSMEETING032023.pdf | Dose Rates around Tagger Hall. SI lifetime etc.]] (Vitaly) |
− | :* | + | :* [[media:proposed_CPP_magnet.pdf | Updates on magnet design ]] (Tim) |
Revision as of 07:55, 30 March 2023
Attended: ... and Igor.
- On March 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].
- Results of meeting with Fermilab group (Moskov)
- Dose Rates around Tagger Hall. SI lifetime etc. (Vitaly)
- Updates on magnet design (Tim)
- On March 13th, we had a meeting with Dave Harding and his FNAL colleagues to discuss a possibility to use FNAL EPB dipole for the CPS.
- On March 6th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Temperature calculations (Tim).
- Vitaly's model.