Difference between revisions of "January 31st, 2022"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
* SIMENS magnet document [https://wiki.jlab.org/klproject/images/7/72/MHRA04133_v21.pdf] | * SIMENS magnet document [https://wiki.jlab.org/klproject/images/7/72/MHRA04133_v21.pdf] | ||
+ | |||
+ | |||
+ | * On January 21st, ''Moskov'' had a ''128-ns'' meeting with accelerator folks (''Reza Kazimi'', ''Alicia Hofler'', ''Geoffrey Krafft'', ''Shukui Zhang'', ''Max Bruker'', and ''Joe Grames''). [https://wiki.jlab.org/klproject/images/3/37/Presentation5.pdf] |
Revision as of 10:57, 21 January 2022
Attended: and Igor.
- On January 20th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- Mikhail's slides are in [2]
- SIMENS magnit paper [3]
- SIMENS magnet document [4]
- On January 21st, Moskov had a 128-ns meeting with accelerator folks (Reza Kazimi, Alicia Hofler, Geoffrey Krafft, Shukui Zhang, Max Bruker, and Joe Grames). [5]