Difference between revisions of "January 31st, 2022"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
<b>Attended</b>: and ''Igor''. | <b>Attended</b>: and ''Igor''. | ||
− | * On January 20th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/January_20,_2022_KLONG_Phase_II_Design_Meeting#Action_Items] | + | * On January 20th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/January_20,_2022_KLONG_Phase_II_Design_Meeting#Action_Items] |
* ''Mikhail's'' slides are in [https://wiki.jlab.org/klproject/images/c/c9/KLF_2022_v0.pptx] | * ''Mikhail's'' slides are in [https://wiki.jlab.org/klproject/images/c/c9/KLF_2022_v0.pptx] |
Revision as of 11:28, 21 January 2022
Attended: and Igor.
- On January 20th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- Mikhail's slides are in [2]
- SIMENS magnit paper [3]
- SIMENS magnet document [4]
- On January 21st, Moskov had a 128-ns meeting with injector folks (Reza Kazimi, Alicia Hofler, Geoffrey Krafft, Shukui Zhang, Max Bruker, and Joe Grames). Sunil's slides are here [5]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run.