− | <b>Attended</b>: | + | <b>Attended</b>: ''Moskov'', ''Mikhail'', ''Justin'', ''Sean'', ''Hovanes'', and ''Igor''. Today, ''Jim'' is in a finding commission. |
* ''Moskov'' proposed to think about ERR-I in March/April [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR]. | * ''Moskov'' proposed to think about ERR-I in March/April [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR]. |
Revision as of 08:14, 28 February 2023
Attended: Moskov, Mikhail, Justin, Sean, Hovanes, and Igor. Today, Jim is in a finding commission.
- Moskov proposed to think about ERR-I in March/April [1].
- Moskov proposed to think about a 7th KLF Collaboration Meeting in May/June after ERR-!.
- On February 27th, we had a meeting with FNAL folks to discuss a possibility to use FNAL EPB dipole for the CPS.
- Questions from Dave Harding:
- What is your schedule? When would you need the magnet?
- Should we assume that this is a permanent installation rather than a loan?
- Would the magnet go straight to JLab? The issue here is making sure that whatever organization receives the magnet has the appropriate licenses to handle the (very slightly) radioactive material.
- Given the current condition of the magnets that we do not consider ready spares, would you want us to refurbish the selected magnet to our current standards?
- Do you have any special requirements on the power and water connections? I’m attaching a photo of one such magnet that we refurbished last year so you can get a feeling for our standard configuration.
- Would you want our beam tube left in place?
- Would you need a spare magnet?
- [Vitaly's slides]
- On February 27th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Temperature calculations (Tim).
- Radiation and Current Leakage between winding in Coil Return Area Vitaly's model.
- On February 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [3].
- Temperature calculations (Tim).
- Review of Vitaly's model.
- On February 6th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [4].
- Temperature calculations (Tim).
- Review of Vitaly's model.
- On February 9th, we had a Hovanes KPT meeting for to prepare for ERR-I [5].