Difference between revisions of "December 6th, 2022"

From kl project
Jump to navigation Jump to search
Line 23: Line 23:
 
* On December 12th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tagger vault with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_December_12,_2022].  
 
* On December 12th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tagger vault with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_December_12,_2022].  
 
:* [[media:temp_calc_tim_02_12_2022.pdf | Temperature calculations]] (''Tim'')
 
:* [[media:temp_calc_tim_02_12_2022.pdf | Temperature calculations]] (''Tim'')
:* Updates on ''Vitaly's'' model
+
:* [[media:temp_CPSDOSESTUD.pdf | Dose rates around CPS and material lifetime. CPS optimizatiion.]] (''Vitaly'')
 
:* [[media:pavel_updates_12_12_20022.pdf | Updates on ''Pavel's'' model]]  
 
:* [[media:pavel_updates_12_12_20022.pdf | Updates on ''Pavel's'' model]]  
 
::* [https://userweb.jlab.org/~pavel/projects/KLCPS/klcps54/ Extra material]
 
::* [https://userweb.jlab.org/~pavel/projects/KLCPS/klcps54/ Extra material]

Revision as of 12:21, 15 December 2022

Attended: Moskov, Sean, Mikhail, Justin, Eugene, Hovanes, and Igor.

  • On November 28th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [1].
  • On December 2nd, Tanja Horn had a CPS meeting (main focus is CPS for Hall C, incuding stress/thermal calculations) [2].
  • On December 5th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [3].
  • On December 8th, we had a Hovanes KPT meeting for to prepare for ERR [4].
  • On December 12th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [5].