Difference between revisions of "June 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 21: Line 21:
  
 
* On June 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_20,_2023].
 
* On June 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_20,_2023].
:* ''Hovanes'' informed us that ''Patrizia'' is scheduled ERR-I for August 2nd. Committee is coming [].
+
:* ''Hovanes'' informed us that ''Patrizia'' is scheduled ERR-I for August 2nd. Committee is coming [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].
 
:* [[media:thermal_analysis_ansys_06_20_2023.pptx | Thermal analysis and thermal stress analysis in ANSYS]] (''Tim'')
 
:* [[media:thermal_analysis_ansys_06_20_2023.pptx | Thermal analysis and thermal stress analysis in ANSYS]] (''Tim'')
 
:* [[media:summary_thermal_mathematica_06_20_2023.pdf | Summary of thermal analysis of the models]] (''Hovanes'')
 
:* [[media:summary_thermal_mathematica_06_20_2023.pdf | Summary of thermal analysis of the models]] (''Hovanes'')

Revision as of 12:44, 21 June 2023

Attended: Moskov, ..., and Igor.

  • Agenda:
  • 7th KLF Collab meeting is scheduled for September 19 [1].
  • Our preparation for EER-I scheduled for August 2, 2023 [2] (Eugene).
  • CPS status (Hovanes)
  • KFM status (Mikhail)
  • 128-ns status (Moskov)
  • Engeneering work status (Eugene)


  • KFM document is in progress.
  • CPS document is coming.


  • On June 26th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [3].


  • On June 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [4].


  • There are several refs for radiation demage on electronics [6][7][8][9]