January 31st, 2022
Jump to navigation
Jump to search
Attended: and Igor.
- On January 20th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- Mikhail's slides are in [2]
- SIMENS magnit paper [3]
- SIMENS magnet document [4]
- On January 21st, Moskov had a 128-ns meeting with injector folks (Reza Kazimi, Alicia Hofler, Geoffrey Krafft, Shukui Zhang, Max Bruker, and Joe Grames). Sunil's slides are here [5]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run.