January 31st, 2022

From kl project
Revision as of 09:07, 31 January 2022 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: Moskov, Sean, Mikhail, Justin, and Igor.


  • On January 20th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • Mikhail's slides are in [2]
  • SIMENS magnit paper [3]
  • SIMENS magnet document [4]


  • On January 21st, Moskov had a 128-ns meeting with injector folks (Reza Kazimi, Alicia Hofler, Geoffrey Krafft, Shukui Zhang, Max Bruker, and Joe Grames). Sunil's slides are here [5]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run.