January 31st, 2022

From kl project
Revision as of 16:16, 20 January 2022 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: and Igor.

  • On January 20th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • Mikhail's slides are in [2]
  • SIMENS magnit paper [3]
  • SIMENS magnet document [4]