Analysis Meeting: January 17th, 2017

From Tritium Experiments Group
Jump to navigation Jump to search

Back to Main Page >> Analysis Meetings >> Pre-experiment

Instructions

Agenda


Attendance

Onsite: Phone:

Discussion

Discussion with Zhihong's slides

  • Raster
       -Doug will get an update from Bill Gunning
       -follow up with possible updates/repair to prevent frequent accesses during tritium running
  • HRS
       HRS momentum limitations
       -priorities for Jack's time from now until running
       -get update from Jack on current status/limitations on HRS magnets
       -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
       Cooling Co-dependence, tripping HRS magnets
       -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
  • DAQ
       -need to decide on final trigger settings for (e'p). (argon will use same trigger)
       -students should get familiar with installed electronics, cable maps, etc.
       -John will send out (e'p) trigger proposal next week
       -parallel NIM and MLU trigger decisions, both sent to TS
  • Scintillator
      S0
       -there wasn't an acceptance issue for GMp
       -will the S0 frame generate too many knocked-out electrons from pions that can create electron-like triggers? (for Marathon)
       -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon