Fall-2018 Target Boiling Study

From Tritium Experiments Group
Jump to navigation Jump to search

Back to Installation and Commissioning

  • E0 = 4.22 GeV
  • HRS-L: Ep = 3.57 GeV/c, Theta = 17 Degrees
  • HRS-R: Ep = 3.0 GeV/c, Theta = 24 Degrees
  • Raster On* (2.5mmx2mm MCC = 1.5 mm x 2mm on target)
  • Empty-Cell Target
Run number Target Beam Current Charge Comment
Empty Cell 22.5 uA 100K Events after cut |VZ|<7.5cm
Empty Cell 19 uA 100K Events after cut |VZ|<7.5cm
Empty Cell 15.5 uA 100K Events after cut |VZ|<7.5cm
Empty Cell 12 uA 100K Events after cut |VZ|<7.5cm
Empty Cell 8.5uA 100K Events after cut |VZ|<7.5cm
Empty Cell 5uA 100K Events after cut |VZ|<7.5cm
  • For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run)
  • H1 Target
Run number Target Beam Current Charge Comment
H1 22.5 uA
H1 19 uA
H1 15.5 uA
H1 12 uA
H1 8.5 uA
H1 5 uA
  • D2 Target
Run number Target Beam Current Charge Comment
3620 and 93641 D2 22.5 uA 3617 and 93638 -> Cut very short by noticing that the interior truck ramp door is open.
D2 19 uA
3619 and 93640 D2 15.5 uA
D2 12 uA
3618 and 93639 D2 8.5 uA
D2 5 uA


  • H3 Target
Run number Target Beam Current Charge Comment
3608 and 93629 H3 22.5uA
3609 and 93630 H3 19 uA
3610 and 93631 H3 15.5 uA
3611 and 93632 H3 12 uA
3612 and 93633 H3 8.5 uA
3613 and 93634 H3 8.5 uA
  • He3 Target
Run number Target Beam Current Charge Comment
3614 and 93635 He3 22.5 uA
He3 19 uA
3615 and 93636 He3 15.5 uA
He3 12 uA
3616 and 93637 He3 8.5uA
He3 5uA