Fall-2018 Target Boiling Study
Jump to navigation
Jump to search
Back to Installation and Commissioning
- E0 = 4.22 GeV
- HRS-L: Ep = 3.57 GeV/c, Theta = 17 Degrees
- HRS-R: Ep = 3.0 GeV/c, Theta = 24 Degrees
- Raster On* (2.5mmx2mm MCC = 1.5 mm x 2mm on target)
- Empty-Cell Target
Run number | Target | Beam Current | Charge | Comment |
Empty Cell | 22.5 uA | 100K Events after cut |VZ|<7.5cm | ||
Empty Cell | 19 uA | 100K Events after cut |VZ|<7.5cm | ||
Empty Cell | 15.5 uA | 100K Events after cut |VZ|<7.5cm | ||
Empty Cell | 12 uA | 100K Events after cut |VZ|<7.5cm | ||
Empty Cell | 8.5uA | 100K Events after cut |VZ|<7.5cm | ||
Empty Cell | 5uA | 100K Events after cut |VZ|<7.5cm |
- For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run)
- H1 Target
Run number | Target | Beam Current | Charge | Comment |
H1 | 22.5 uA | |||
H1 | 19 uA | |||
H1 | 15.5 uA | |||
H1 | 12 uA | |||
H1 | 8.5 uA | |||
H1 | 5 uA |
- D2 Target
Run number | Target | Beam Current | Charge | Comment |
3620 and 93641 | D2 | 22.5 uA | 3617 and 93638 -> Cut very short by noticing that the interior truck ramp door is open. | |
D2 | 19 uA | |||
3619 and 93640 | D2 | 15.5 uA | ||
D2 | 12 uA | |||
3618 and 93639 | D2 | 8.5 uA | ||
D2 | 5 uA |
- H3 Target
Run number | Target | Beam Current | Charge | Comment |
3608 and 93629 | H3 | 22.5uA | ||
3609 and 93630 | H3 | 19 uA | ||
3610 and 93631 | H3 | 15.5 uA | ||
3611 and 93632 | H3 | 12 uA | ||
3612 and 93633 | H3 | 8.5 uA | ||
3613 and 93634 | H3 | 8.5 uA |
- He3 Target
Run number | Target | Beam Current | Charge | Comment |
3614 and 93635 | He3 | 22.5 uA | ||
He3 | 19 uA | |||
3615 and 93636 | He3 | 15.5 uA | ||
He3 | 12 uA | |||
3616 and 93637 | He3 | 8.5uA | ||
He3 | 5uA |