HRS Optics with saturated Q1

From Tritium Experiments Group
Jump to navigation Jump to search

Back to Installation and Commissioning

  1. Multifoil target:
    1. one DIS run without sieve for y-target calibration
    2. sieve on, take a long DIS run for theta, phi calibration
  2. Hydrogen target: elastic peak check (move RHRS to a larger angle), and delta scan at +-2%, +-4% of elastic peak