New Installation and Configuration
Jump to navigation
Jump to search
Back to Installation and Commissioning
Target Info
- Survey, Density, Windows and other Info of the Target [https:// link]
- Hall A target gas cell fill pressures and temperatures [https:// halog]
- He3 Certification [https:// file]
- Hall-A Tritium Target FSD Verification Checklist [https:// file]
Survey Info
Beam Instrumentation
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
17 | 09/24/2018 | SRC | xxxx ~ xxxx | link |
- HRS-R
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
24 | 09/24/2018 | SRC | xxxx ~ xxxx | link |