Run Meeting: April 17th, 2018
Jump to navigation
Jump to search
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Florian Hauenstein
e'p
Very stable beam through swing and owl. We were collecting about 2h dummy data and a total of 580mC on He3 and 740mC on Tritium. Today is RF recovery and we will get the survey of the spectrometer, a walkthrough from Doug and the postponed BCM calibration.
For the swing and owl it is planned to do finally the postponed BCM calibration.
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653