Run Meeting: April 18th, 2018
Jump to navigation
Jump to search
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Florian Hauenstein
e'p
Very stable beam. Collected charge on tritium is 1.1C and He3 1.15C in slow kinematics During swing yesterday took BCM calibration run with very stable beam (see beam chart https://logbooks.jlab.org/entry/3562570)
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653