Run Meeting: February 16th, 2018
Jump to navigation
Jump to search
Back to Main Page Daily_Run_Meetings
4:00PM Run Meeting, Counting house meeting room (200C)
Summary of past 24h:
- Beam was away whole swing, and came back during the night at 1/3 of our requested intensity: => not much data throughout the night;
- MCC setup a plan of attack to tackle the machine issues
- => beam back at the very end of the day for Hall A and C, almost at nominal current
- (albeit with some minor tuning still going on, at injector level, and beamline tuning going on for halls B and D).
Plan: take production data for kin15 and 16 (if beam)
Slides
- Tyler K Calorimeter Calibration Mike's slides
- Hanjie S0, S2, Cer gain matchslides
- Evan Pass1 ODEF discussion
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653
To join via Browser: https://bluejeans.com/372278653/browser